Pre-Operation checklist
Before operating the Proteus Safe System, it is essential to perform a series of checks to ensure the system is safe, functional, and ready for operation. The following pre-operation checks must be completed by the operator
# |
Description |
Comment |
|
Inspect the robot for visible damage, including dents, scratches, or loose components |
|
|
Verify that all electrical connectors, hoses, and tethers are properly attached and undamaged. |
|
|
Check that the tool is securely mounted and free from any foreign objects that could hinder its movement. |
|
|
Ensure that the robot’s wheels and bearings rotate freely and are free of debris |
|
|
Verify that the wireless controller is functioning properly, including the emergency stop button. | |
|
|
Check the camera glass for cleanliness and visibility. Clean if necessary |
|
|
Inspect the PCC display and verify that the system status and camera feeds are functioning. |
|
|
Perform a system function test to ensure all parts are operational. Listen for abnormal sounds during the test. |
|