Post-Operation checklist
Before operating the Proteus Safe System, it is essential to perform a series of checks to ensure the system is safe, functional, and ready for operation. The following pre-operation checks must be completed by the operator
# |
Description |
Comment |
|
Inspect the robot for any signs of wear, damage, or loose parts resulting from the operation. |
|
|
Check all cables, hoses, and connectors for any signs of wear or damage. |
|
|
Clean any foreign debris from the robot using compressed air, if applicable |
|
|
Check the tool for any wear or damage. |
|
|
Inspect all glass on the equipment, such as the camera and lights, for damage. |
|
|
Verify that magnet is clean and free from debris |
|
|
Check if all auxiliary equipment, such as the wireless controller, chargers, batteries are in its designated locations. |
|
|
Document any issues encountered during operation in the maintenance log for corrective maintenance. |
|