LARS is typically mobilized in its transport state and must be properly deployed for operation. The following step-by-step guide outlines the deployment process:

Step #

Description


Remove the straps securing the parking plates to the frame.


Remove both parking plates and set them aside temporarily.


Remove the securing pins that hold the ramps to the frame.


Rotate each ramp into its operational position, ensuring a controlled movement.


Position the ramp onto the frame and secure it by installing all six safety pins.


Repeat the process for the other ramp.


Reinstall both parking plates by securing them with four pins each.