Procedures
The following procedures are available for Achilles Robot System:
Pre- and Post deployment Procedure
The Pre- and Post-Deployment Procedure Checklist ensures that the vehicle, habitat, cameras, cleaning tool, and motors are inspected before and after each deployment.
Conducted by Remotion personnel, the checklist helps detect potential issues, ensuring that connectors, cables, pressure systems, cameras, motors, and high-pressure components are secure and functioning correctly.
Regular maintenance and thorough inspections prevent operational failures and maintain safety.
The Habitat Assembly Procedure outlines the steps for disassembling, assembling, and maintaining the habitat, including replacing the vacuum gasket and conducting general inspections.
The process ensures that all connections, hoses, and actuators are correctly reattached and that a full function test is performed before diving.
Proper maintenance and assembly help prevent failures and ensure the habitat operates safely and efficiently.
The Rigging Procedure details the setup, securing, and rigging methods required for deploying Achilles in confined or hard-to-reach areas.
It specifies equipment, tools, and safety requirements, ensuring only certified personnel conduct the rigging.
The document includes methods for securing Achilles on vessels, bow operations, and optional launch/recovery systems (LARS) to ensure safe and stable positioning for both onshore and offshore operations.
The Launch and Recovery Procedure provides a step-by-step guide for safely deploying and retrieving the Achilles system using the LARS (Launch and Recovery System).
It ensures that safety protocols, communication checks, securing methods, and environmental considerations are followed.
The procedure includes pre-launch safety measures, controlled deployment, operational positioning, retrieval steps, and post-operation reporting, emphasizing safe handling of the magnetic system and compliance with work permits and client coordination.
The Mobilization and De-Mobilization Procedure ensures the safe, efficient handling, transport, and inspection of the Achilles robot and related equipment.
The Mobilization Procedure covers equipment checks, maintenance verification, function testing, and compliance with transport standards before deployment.
The De-Mobilization Procedure ensures thorough inspection, inventory updates, maintenance documentation, and proper storage after project completion, maintaining operational readiness and safety standards for future deployments.