Handling and Transportation
When transporting and handling robots, extra care must be taken regarding the magnets, between the wheels, under the robot.
|
Rigging and handling shall be planned by the personnel operating the Proteus Safe on site according to the site lifting procedures. The robot can be handled by a single person if no tools are installed. |
|
NORSOK R-003, Arbeidstilsynets Forskrift om utførelse av arbeid (Best.nr.1357) and Petroleumstilsynet Aktivitetsforskriften §92 is the governing standard and regulation for lifting. |
- Manual handling of Proteus Safe
- Handling with equipment
- Securing Proteus Safe during operation
- Transportation